Cometly
Acuity Scheduling integration
Acuity Scheduling logo
Scheduling · Pipeline Attribution

Acuity Scheduling pipeline, attributed to source.

Cometly sits alongside Acuity Scheduling with two-way sync. Every contact, lead, and opportunity stage change flows back attributed to the campaign that created it, with multi-touch credit across the buying committee.

What you get

Acuity Scheduling pipeline attribution,
wired to revenue.

Every Acuity Scheduling event flows into Cometly tagged to its source, then feeds straight into pipeline attribution dashboards and Slack digests your team actually opens.

  • Map every Acuity Scheduling stage transition to first-touch + last-touch + linear source
  • Account-level rollups across the buying committee (multi-contact, multi-device)
  • Pipeline reports broken down by channel, campaign, ad, and audience
  • Sync ARR, opportunity stage, and lifecycle changes back to ad platforms as conversions
How it works

From Acuity Scheduling to attribution in three steps.

  1. Step 01

    Connect Acuity Scheduling

    OAuth into Acuity Scheduling and pick the objects (Contact, Lead, Opportunity, Account) that matter for your pipeline reporting.

  2. Step 02

    Map stages to attribution events

    Cometly auto-maps your Acuity Scheduling stages (MQL, SQL, Opportunity, Closed-Won) to multi-touch attribution events. Customize the mapping per pipeline.

  3. Step 03

    Roll up at the account level

    Account-level rollups stitch every contact + session + device under one attributed journey, even when the buying committee is 4 people across 6 sessions.

FAQ

Quick answers.

Don't see your question? Book a 30-minute walkthrough and we'll answer it on the call.

How long does the Acuity Scheduling integration take to set up?
Most teams have Acuity Scheduling flowing into Cometly inside five minutes. The connection uses Webhook, and Cometly auto-maps the standard fields, so no developer is required. Setup is 5 guided steps inside the Events Manager.
Do I need engineering help to connect Acuity Scheduling?
No. We support setup via Webhook, which is approachable for anyone on a marketing team, with no engineers required.
How does Cometly attribute Acuity Scheduling stage transitions to ad spend?
Cometly listens to every Acuity Scheduling stage change (Lead → MQL → SQL → Opportunity → Closed-Won) and applies first-touch, last-touch, and linear attribution to each transition. Stage-level pipeline reports show source, campaign, and ad, and roll up at the account level for multi-contact buying committees.
Does this work for buying committees with multiple Acuity Scheduling contacts?
Yes. Cometly's account-level attribution stitches every contact under a single account, even when they came from different sessions, devices, or ad clicks. The full account journey is preserved, and pipeline reports credit each touch correctly.

See Acuity Scheduling pipeline attribution live.

Book a 30-minute demo. We'll wire Acuity Scheduling into your stack on the call and show you pipeline attribution on real data.